Attendees services

Servers and applications

Internet Access

  • Centro Cultural San Martín: All rooms and common spaces have full Internet access, use "Wikimania2009" wireless network
  • Teatro Alvear: Internet connection available inside theatre, use "Wikimania2009" wireless network
  • Hotel Bauen Almost all rooms have Internet access using hotel network, use "Bauen*" networks, some rooms have low signal. Floor 2 (breakfast room) and Hall have a Wikimedia2009 network.

Conference rooms

  • All rooms have almost 20 power conectors for laptops (220 Volts / 50 Hz)
  • Internet access

Speakers

Instructions to upload conference slides and other material required during each session.

  • Create a compressed file with all of your material
    • Use tar.gz, ZIP or RAR format
    • Include all of your material, slides, videos, documents, etc.
    • Use a name DAY_ROOM_NAME.ZIP file name format replacing DAY, ROOM and NAME according to your session.
  • Upload the compressed file to ftp.wikimania.bal.org.ar using anonymous user with your favorite FTP client, for example filezilla
    • If you are in Windows without installing any software you can go to Start-->Run and enter "iexplore ftp://ftp.wikimania.bal.org.ar". This will open a window where you should be able to "throw" your compressed file.

In any case, please present on the room where you will speak 15 minutes before the scheduled time.

Diagramas y planos

Network layout

 

DHCP client distribution sample

 

Network layout using graphviz (outdated)

 

Configuración

Tareas

Resumen de tareas previas al comienzo de Wikimania
Tarea Coordinador Deadline Estado
Contratar enlace inet CCGSM tute 10 Finalizado.
Conseguir sala para el armado Pato 9 Finalizado.
Comprar hardware de conectividad Martin 10 Finalizado.
Poner en USLA sitio web de prensa gacq 10 Finalizado.
Comprar servidores leito 7 Finalizado
Compras en ditelco martin 15 Finalizado.
Erección CCGSM enlace Alvear y Bauen Martin 19 Finalizado.
Erección Alvear - CCGSM Martin 19 Finalizado.
Armado del servidor CCGSM Likevinyl 13 Finalizado.
Comprar y armado del servidor Alvear Likevinyl 18 Finalizado.
Ajustar enlace CCGSM a Alvear Martin 19 Finalizado.
Erección Bauen - CCGSM Martin 19 Finalizado.
DNS zona interna y externa gacq 17 Finalizado.
Contratar handies machu 10 Finalizado.
Coordinar instalación enlace speedy CCGSM gacq 17 Finalizado.
Coordinar instalación enlace speedy Alvear gacq 17 Finalizado.
Alquilar cañones, pantallas y PCs para salas machu 10 Finalizado.
Ver si hace falta poner AP en Hall del Bauen tute 23 Finalizado.
Cadenas laptops machu 10 Finalizado.
Cableado UTP Alvear tute 17 Finalizado.
Cableado UTP Bauen tute 17 Finalizado.
DHCP fefu 19 Finalizado.
Proxy trasparente fefu 19 Finalizado.
Ralay interno streaming leito 21 Finalizado.
Configuración de APs de salas Kensukeido Finalizado.
Poner AP en 2do piso Bauen tute 23 Finalizado.
Preparar laptops registracion krosto 25 Finalizado.
Preparar laptops hall euge 25 faltan ajustes
Alimentación eléctrica akela 17 Finalizado.
Cableado UTP CCGSM tute 17 Finalizado.
Sistema de monitoreo tute 20 Finalizado.
Servidor de archivos gacq 20 Finalizado.
NAT / Traffic Shaping osiris 18 Finalizado.
Routing interno / Direccionamiento IP osiris 18 Finalizado.
Streaming setup leito 21 Finalizado.
Instalación de APs Kensukeido 21 Finalizado.
Pruebas 22 En prueba...
Ajustes 23 Ajustando...

Notas

Lugar para armado

Lugar en el hotel Buen para realizar la configuracion de la red.

  • Hall de atrás
  • Piso 19
  • 2do piso (opcional)

Enlaces

  • Se hizo una prueba rapida en el enlace CCGSM - Alvear que dio 12 megas simetricos. El cable esta provisoriamente en la Depto de Sondio. Tiene lagro para llegar hasta el teatro.
  • Enlace CCGSM-Bauen 25/26 megas simétricos

Computadoras

Servidores

CCGSM

Servicios
  • DNS cache y master de wikimania.bal.org.ar
  • Router
  • Firewall
  • NAT con traffic shaping
  • Balanceo de carga
  • Contingencia por enlace wireless
  • Proxy trasparente en puerto 80
  • Monitoreo central usando Munin
Asignacion interfaces
Interface Destino
eth0 IPLAN 1
eth1 DMZ / Servers
eth2 Enlace Alvear
eth3 IPLAN 2
eth4 Enlace Bauen
eth5 Zona 1
eth6 Zona 2
eth7 Zona 3
eth8 Speedy 1 switch

Alvear

Servicios
  • Router
  • Firewall
  • NAT con traffic shaping
  • Balanceo de carga
  • Contingencia por enlace wireless
  • Proxy trasparente en puerto 80
Asignacion interfaces
Interface Destino
eth0 Enlace CCGSM
eth1 Speedy 1
eth2 Speedy 2
eth3
eth4 Zona 1

Servidor de aplicaciones 1

Servicios
  • Fileserver
  • Nagios
  • Mirror de Wikipedia en Español
  • Mirror de Wikipedia en Ingles
  • Jamendo
  • Magoo

Salas

Registración

Switches

Switches
Interface Destino
Salas 5 minis
Rack 1 de 24 bocas con vlans (prestamo de tute)
Machumania 1 de 24 bocas con vlans (prestamo de kensukeido)
Alvear 1 mini
Bauen 1 mini
Backup 1 mini

Enlaces a Internet

Enlaces
Proveedor Ubicación Bandwidth Estado
IPLAN CCGSM1 10 Mbits UP
IPLAN CCGSM2 10 Mbits UP
Speedy CCGSM3 2 Mbits UP
Speedy CCGSM4 2 Mbits Problema en cable, no se instalará
Speedy Alvear1 2 Mbits UP
Speedy Alvear2 4 Mbits UP

Requerimientos eléctricos

Registración

  • PCs registración 1 zapatilla x 4 (4 Tomas) TERMINADO
  • Impresoras 1 zapatilla x 4 (4 Tomas) TERMINADO

Hall AB

  • Living: 5 Zapatillas x 4 (20 tomas) (LISTO - FALTA ARREGLAR LOS SILLONES)
  • Living: 5 Zapatillas x 2 (10 tomas) (LISTO - FALTA ARREGLAR LOS SILLONES)
  • Cafeteras: 1 Zapatilla x 2 (2 tomas) (TERMINADO)
  • Terra 1 Zapatillas x 4 (4 tomas) (TERMINADO)
  • Speedy 1 Zapatilla x 4 (3 tomas) (TERMINADO)
  • Speedy 1 Zapatilla x 2 (2 tomas) (TERMINADO)

Entrepiso Sarmiento

  • Cafeteras: 2 Zapatilla x 4 (8 tomas) (TERMINADO)

Rincon Prensa

  • Living 1 Zapatilla x 4 (3 tomas) (TERMINADO)
  • Cafeteras: 1 Zapatilla x 4 (3 tomas) (TERMINADO)
  • La Copiona 1 Zapatilla x 2 (2 tomas)

Cocina

  • 2 Conectores 20Amp

Hacklab

  • Living: 8 Zapatillas x 4 (32 tomas) (TERMINADO)
  • Mesas: 8 Zapatillas x 4 (32 tomas) (TERMINADO)
  • Tachos Iluminacion (TERMINADO)
  • Cafeteras: 1 Zapatilla x 4 (4 tomas) (TERMINADO)

Sala técnica

  • Servidores Streaming: 2 Zapatillas x 4 (8 tomas) (TERMINADO)

Salas C

  • Proyector + PC disertante: 1 Zapatilla x 4 (Alargue 4 tomas) (TERMINADO)
  • Tomas adicionales para asistentes: 6 Zapatilla x 4 (24 tomas) (TERMINADO)

Salas D

  • Proyector + PC disertante: 1 Zapatilla x 4 (Alargue 4 tomas) (TERMINADO)
  • Tomas adicionales para asistentes: 6 Zapatilla x 4 (24 tomas) (TERMINADO)

Salas F

  • Proyector + PC disertante: 1 Zapatilla x 4 (Alargue 4 tomas) (TERMINADO)
  • Tomas adicionales para asistentes: 6 Zapatilla x 4 (24 tomas) (TERMINADO)

Salas MADRES

  • Proyector + PC disertante: 1 Zapatilla x 4 (Alargue 4 tomas)
  • Tomas adicionales para asistentes: 6 Zapatilla x 4 (24 tomas)
  • Toma para streaming 1 Zapatilla x 4 (4 tomas) (TERMINADO)

Salas MUIÑO

  • Proyector + PC disertante: 1 Zapatilla x 4 (Alargue 4 tomas)
  • Tomas adicionales para asistentes: 4 Zapatilla x 4 (16 tomas)

Alvear

  • Alimentación para prensa 10 zapatillas de 4 tomas # Van a estar en los 2 balcones laterales de la planta baja.
  • Las cámaras van a estar en el primer piso, para eso hay unos 5 tomas azules del mismo teatro
  • Alimentación para audio 3 Zapatillas, TERMINADO

Bauen

  • 4 (16 tomas) Zapatillas Living entrepiso (3mts)
  • Zapatillas en lugares comunes donde se pueda necesitar.

Warning Tips

  • Tomas de iluminación => Los enchufes entre tachos estaban flojos - Verificar si la línea no sobrecaliente - Verificar que no se golpeen los tachos de las lumniarias.


Routing interno / Direccionamiento IP

En proceso de análisis, probablemente se usará iproute' con dos default gateway en gw01 y gw02 y como plan de contigencia mediante monitoreo de enlace se cambien las rutas apuntando al default gateway de la salida inet del otro isp.